{"id":6122,"date":"2020-10-20T15:16:59","date_gmt":"2020-10-20T15:16:59","guid":{"rendered":"https:\/\/www.imegcorp.com\/?p=6122"},"modified":"2021-04-20T22:40:55","modified_gmt":"2021-04-20T22:40:55","slug":"have-a-fear-of-missing-out-rpm-can-ensure-you-wont","status":"publish","type":"post","link":"https:\/\/imegcorp.com\/insights\/blog\/have-a-fear-of-missing-out-rpm-can-ensure-you-wont\/","title":{"rendered":"Have a fear of missing out? RPM can ensure you won\u2019t"},"content":{"rendered":"
By Adam McMillen<\/span><\/p>\n Rapid performance modeling is customized to each project to prioritize the most impactful benefits. A typical RPM, however, might include:<\/span>\u00a0<\/span><\/p>\n \u00a0<\/span><\/td>\n<\/tr>\n<\/thead>\n<\/table>\n Owners too often miss out on significant energy- and cost-saving features by assuming they are out of budget or deferring decisions until after construction is underway. However, an early analysis of a building\u2019s MEP and other key systems \u2013 known as rapid performance modeling or \u201cRPM\u201d \u2013 can help owners understand the big decisions that will define their building\u2019s performance from the very beginning.\u00a0<\/span>\u00a0<\/span><\/p>\n RPM occurs during concept and\/or schematic design phases and pairs quick modeling studies with timely design guidance for key features like building insulation and mass, glazing and shading passive strategies, and HVAC and lighting systems. It prioritizes the most impactful analyses that produce actionable results within a focused two- to three-week period.<\/span>\u00a0<\/span><\/p>\n\n\n
\n \n RPM\u00a0<\/span><\/span>at a glance<\/span><\/span><\/h4>\n
\n
\n
\n