{"id":3784,"date":"2020-03-16T18:14:20","date_gmt":"2020-03-16T18:14:20","guid":{"rendered":"https:\/\/www.imegcorp.com\/?p=3784"},"modified":"2020-08-31T23:01:03","modified_gmt":"2020-08-31T23:01:03","slug":"virtual-tools-to-improve-your-project","status":"publish","type":"post","link":"https:\/\/imegcorp.com\/insights\/blog\/virtual-tools-to-improve-your-project\/","title":{"rendered":"Use virtual tools to increase user input, reduce risk, and improve project outcome"},"content":{"rendered":"
By Mike Lawless<\/p>\n
How many times have you seen a room after construction and wished something had been designed differently? Had\u00a0<\/span>you\u00a0<\/span>been able to see the finished space before construction,\u00a0<\/span>you\u00a0<\/span>could have changed the design when it was <\/span>possible to do so \u2013 with no delay or additional cost.\u00a0<\/span>\u00a0<\/span><\/p>\n